Tehri Dam
Why Dams?? Introduction : Tehri Dam History Project Details Benefits Issues and Protests Major Concerns Mitigation Measures Realities Conclusion Refernces
Hydro-power is a clean, renewable, low-cost alternative. Flexible and reliable and more efficient than any other form of electricity generation. Supports various kinds of aesthetic and recreational activities. Other benefits : manage floodwater, irrigate fields, and provide water supply
Initially taken up by the Irrigation Department of the Uttar Pradesh government. In 1988, was taken over by a joint venture company of the Government of India and the Uttar Pradesh government, called the Tehri Hydro Development Corporation(THDC)
History
First multipurpose river valley project on Bhagirathi, the main tributary of the Ganga. 260.5m high earth and rockfill dam, spillway structures and an underground power house. The spillways have been designed for a Probable Maximum Flood (PMF) of 15540 cumecs computed for a return frequency of 1 in 10,000 years at the project site. Four diversion tunnels
Benefits To Nation / Region
Benefits To Affected Population Development of Hill Station Better Road Network Education Health Electrification Drinking Water Facilities Setting of New Industries Tourism Commercial Centre
Change in the (i) water chemistry, especially with respect to dissolved oxygen and (ii) turbidity of water. Impact on biodiversity, i.e., flora and fauna of the area. Obstruction of movements of migrating fish species during breeding season.  Reduction in the capacity and life of reservoir was studied
1978 - Tehri Bandh Virodhi Sangharsh Samiti (TBVSS) 74-day hunger strike in 1996 by Sunderlal Bahuguna  Many Anti-dam rallies and protest
Protester with anti-Tehri Dam slogans Work stopped
Major Concerns
The design of the dam was finalized in the 1960s when scientific understanding of seismic hazards and seismic engineering solutions were far less advanced than today
Location : world's most earthquake-prone regions with several fault lines traversing the project area. Not adequately equipped to withstand earthquakes of the magnitude expected during its life span Designed for 7.2 ; expected : 8.5 or more  One of the leading seismologists in the world, Professor James Brune, has described Tehri as “one of the most dangerous dams world-wide.”
If the dam fails or a major landslide causes a huge wave to overtop the reservoir, a 260-meter high flood wave would crash down into the densely populated valleys below the dam, burying the towns of Rishikesh, Hardwar, Bijnor, Meerut, Hapur and Bulandshahar within hours and devastating large areas of the Gangetic Plains. Estimate : 10 million people
December 2001 : main bridge leading to Tehri town and nearby areas submerged. Can lead to complete submergence of Tehri Town and surrounding villages.
Tehri Dam then and now
Massive transfer of water from the Himalayan region to New Delhi, where the average per capita consumption of water is 250 liters per day as compared to 10 liters per day for the villagers of the Tehri region “The Tehri project is stealing from the poor to subsidize the rich,” says Bahuguna.
Around 1 lakh affected directly or indirectly. No resettlement plan : some given compensation , some house , others nothing rehabilitation appalling, even though a sum of Rs 1117.15 lakhs is reported to have been spent
A cost-benefit analysis by the Indian National Trust for Art and Culture Heritage (INTACH) came to the conclusion that the costs of the US$2 billion project will be at least twice as high as the expected benefits. Tehri is “an enormous squandering of public money.
1980 : Rs.206 crores  1994 : Estimated price - US$612 million 1999 : Estimated price - US$1.2 billion On Completion of first phase : July 2006  More than US$ 2.5 billion
Life of Dam  Projected 100 years due to the huge volume of sediment that will be trapped in its reservoir – reduced to 30-40  Cost of electricity per unit almost trice the average cost of power supply in the neighboring states
NEW TEHRI
Situated at an elevation between 1550 to 1950 mts. A modern and well planned town Important centre of attraction
Tehri in pictures
Old Tehri
Just Before the construction
Tehri Dam Lake
Bridge Across Tehri Dam
Construction Work
Muddy waters from Tehri Dam construction
Diversion Tunnel
Top View
Submerging Tehri
New Tehri
MITIGATION Measures
Measures For Ecological Impacts
Measures For Social Impacts
Compensation  has been reserved for those who had land in their name before 1985 Only Who had more than half of their  lands acquired qualify for complete rehabilitation Government's rehabilitation policy does not clearly state anything about partially submerged villages
“This is a dam built with our tears”      ………… SunderlalBahuguna

More Related Content

What's hot

50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]
sachindk
 

What's hot (20)

EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVER
 
Bhuj earthquake 2001 by:umang talpara
Bhuj earthquake 2001 by:umang talparaBhuj earthquake 2001 by:umang talpara
Bhuj earthquake 2001 by:umang talpara
 
The Kedarnath Trajedy
The Kedarnath TrajedyThe Kedarnath Trajedy
The Kedarnath Trajedy
 
Presentation on case study of uttarakhand flood
Presentation on case study of uttarakhand floodPresentation on case study of uttarakhand flood
Presentation on case study of uttarakhand flood
 
Uttarakhand Avalanche: 07 February 2021
Uttarakhand Avalanche: 07 February 2021Uttarakhand Avalanche: 07 February 2021
Uttarakhand Avalanche: 07 February 2021
 
Issues almatti dam_gurudath_ret15004
Issues almatti dam_gurudath_ret15004Issues almatti dam_gurudath_ret15004
Issues almatti dam_gurudath_ret15004
 
Kedarnath cloudburst
Kedarnath cloudburstKedarnath cloudburst
Kedarnath cloudburst
 
Narmada bachao andolan
Narmada bachao andolanNarmada bachao andolan
Narmada bachao andolan
 
2021 uttarakhand flood
2021 uttarakhand flood2021 uttarakhand flood
2021 uttarakhand flood
 
Narmada Bachao Andolan
Narmada Bachao AndolanNarmada Bachao Andolan
Narmada Bachao Andolan
 
Bihar flood
Bihar floodBihar flood
Bihar flood
 
Bhopal disaster
Bhopal disasterBhopal disaster
Bhopal disaster
 
Environmental movement in india
Environmental movement in indiaEnvironmental movement in india
Environmental movement in india
 
A PowerPoint Presentation on Chennai Floods-2015
A PowerPoint Presentation on Chennai Floods-2015A PowerPoint Presentation on Chennai Floods-2015
A PowerPoint Presentation on Chennai Floods-2015
 
50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]
 
Earthquack 2001 Bhuj,Gujarat
Earthquack 2001 Bhuj,GujaratEarthquack 2001 Bhuj,Gujarat
Earthquack 2001 Bhuj,Gujarat
 
Damodar valley
Damodar valleyDamodar valley
Damodar valley
 
GANGA ACTION PLAN
GANGA ACTION PLANGANGA ACTION PLAN
GANGA ACTION PLAN
 
Jammu &kashmir 2014 flood case study
Jammu &kashmir 2014 flood case studyJammu &kashmir 2014 flood case study
Jammu &kashmir 2014 flood case study
 
Narmada Bachao Andolan Case study 2.pptx
Narmada Bachao Andolan  Case study 2.pptxNarmada Bachao Andolan  Case study 2.pptx
Narmada Bachao Andolan Case study 2.pptx
 

Viewers also liked

Ppt on automation
Ppt on automation Ppt on automation
Ppt on automation
harshaa
 

Viewers also liked (6)

Big Data Case Study: Transform Marketing And Take More
Big Data Case Study: Transform Marketing And Take More Big Data Case Study: Transform Marketing And Take More
Big Data Case Study: Transform Marketing And Take More
 
Digital asset management: A major content marketing trend
Digital asset management: A major content marketing trendDigital asset management: A major content marketing trend
Digital asset management: A major content marketing trend
 
Digital Asset Management (DAM) Strategy
Digital Asset Management (DAM) Strategy Digital Asset Management (DAM) Strategy
Digital Asset Management (DAM) Strategy
 
SAP Hybris Marketing - Cosmin Costea
SAP Hybris Marketing - Cosmin CosteaSAP Hybris Marketing - Cosmin Costea
SAP Hybris Marketing - Cosmin Costea
 
Recommendations for Complex Digital Asset Management
Recommendations for Complex Digital Asset ManagementRecommendations for Complex Digital Asset Management
Recommendations for Complex Digital Asset Management
 
Ppt on automation
Ppt on automation Ppt on automation
Ppt on automation
 

Similar to TEHRI DAM & ITS IMPLICATIONS

The Hoover Dam And Its Construction Essay
The Hoover Dam And Its Construction EssayThe Hoover Dam And Its Construction Essay
The Hoover Dam And Its Construction Essay
Sharon Lee
 

Similar to TEHRI DAM & ITS IMPLICATIONS (20)

The Three Gorges Dam
The Three Gorges DamThe Three Gorges Dam
The Three Gorges Dam
 
The Three Gorges Dam
The Three Gorges Dam The Three Gorges Dam
The Three Gorges Dam
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
A CASE STUDY ON TEHRI DAM
A CASE STUDY ON TEHRI DAMA CASE STUDY ON TEHRI DAM
A CASE STUDY ON TEHRI DAM
 
Dam engineering i 1
Dam engineering i 1Dam engineering i 1
Dam engineering i 1
 
The purposes of building a dam
The purposes of building a damThe purposes of building a dam
The purposes of building a dam
 
The Hoover Dam And Its Construction Essay
The Hoover Dam And Its Construction EssayThe Hoover Dam And Its Construction Essay
The Hoover Dam And Its Construction Essay
 
Social and Environmental Impact of hydropower project in Uttarakhand Himalayas
Social and Environmental Impact of hydropower project in Uttarakhand HimalayasSocial and Environmental Impact of hydropower project in Uttarakhand Himalayas
Social and Environmental Impact of hydropower project in Uttarakhand Himalayas
 
Displacement case study- three gorges, China
Displacement case study- three gorges, China Displacement case study- three gorges, China
Displacement case study- three gorges, China
 
Tehri Dam
Tehri DamTehri Dam
Tehri Dam
 
Dams
DamsDams
Dams
 
MBA - Project Management - Mega Projects and the Impact on Society
MBA - Project Management - Mega Projects and the Impact on SocietyMBA - Project Management - Mega Projects and the Impact on Society
MBA - Project Management - Mega Projects and the Impact on Society
 
Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Surya
 
Dams:Pros and Cons
Dams:Pros and ConsDams:Pros and Cons
Dams:Pros and Cons
 
THE THREE GORGES ppt
THE THREE GORGES pptTHE THREE GORGES ppt
THE THREE GORGES ppt
 
Three georges dam (china) real##
Three georges dam  (china) real##  Three georges dam  (china) real##
Three georges dam (china) real##
 
Three gorges dam project
Three gorges dam projectThree gorges dam project
Three gorges dam project
 
Tipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar SonetTipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar Sonet
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Banqiao Dam Failure
Banqiao Dam FailureBanqiao Dam Failure
Banqiao Dam Failure
 

More from A Y V CHENULU (16)

History of flight
History of flightHistory of flight
History of flight
 
Personality development notes
Personality development notesPersonality development notes
Personality development notes
 
The art of_being_well
The art of_being_wellThe art of_being_well
The art of_being_well
 
Indian history by A ADARSH
Indian history by A ADARSHIndian history by A ADARSH
Indian history by A ADARSH
 
Bhagavat gita simplified
Bhagavat gita simplifiedBhagavat gita simplified
Bhagavat gita simplified
 
ESP
ESPESP
ESP
 
Ethics in business
Ethics in businessEthics in business
Ethics in business
 
Principles of eagle
Principles of eaglePrinciples of eagle
Principles of eagle
 
Steelindustry an introduction
Steelindustry an introductionSteelindustry an introduction
Steelindustry an introduction
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Baghouse
BaghouseBaghouse
Baghouse
 
The weather
The weatherThe weather
The weather
 
The ant story
The ant storyThe ant story
The ant story
 
Bhilai Sms 1.
Bhilai Sms 1.Bhilai Sms 1.
Bhilai Sms 1.
 
Gayatrimantra
GayatrimantraGayatrimantra
Gayatrimantra
 
The Beautyful Shree Ganesha
The Beautyful Shree GaneshaThe Beautyful Shree Ganesha
The Beautyful Shree Ganesha
 

Recently uploaded

Personalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaPersonalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
EADTU
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MysoreMuleSoftMeetup
 

Recently uploaded (20)

FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdfUGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaPersonalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptxMichaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
Michaelis Menten Equation and Estimation Of Vmax and Tmax.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of Play
 
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
MuleSoft Integration with AWS Textract | Calling AWS Textract API |AWS - Clou...
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 

TEHRI DAM & ITS IMPLICATIONS

  • 2. Why Dams?? Introduction : Tehri Dam History Project Details Benefits Issues and Protests Major Concerns Mitigation Measures Realities Conclusion Refernces
  • 3. Hydro-power is a clean, renewable, low-cost alternative. Flexible and reliable and more efficient than any other form of electricity generation. Supports various kinds of aesthetic and recreational activities. Other benefits : manage floodwater, irrigate fields, and provide water supply
  • 4. Initially taken up by the Irrigation Department of the Uttar Pradesh government. In 1988, was taken over by a joint venture company of the Government of India and the Uttar Pradesh government, called the Tehri Hydro Development Corporation(THDC)
  • 5.
  • 7.
  • 8. First multipurpose river valley project on Bhagirathi, the main tributary of the Ganga. 260.5m high earth and rockfill dam, spillway structures and an underground power house. The spillways have been designed for a Probable Maximum Flood (PMF) of 15540 cumecs computed for a return frequency of 1 in 10,000 years at the project site. Four diversion tunnels
  • 9.
  • 10. Benefits To Nation / Region
  • 11. Benefits To Affected Population Development of Hill Station Better Road Network Education Health Electrification Drinking Water Facilities Setting of New Industries Tourism Commercial Centre
  • 12. Change in the (i) water chemistry, especially with respect to dissolved oxygen and (ii) turbidity of water. Impact on biodiversity, i.e., flora and fauna of the area. Obstruction of movements of migrating fish species during breeding season. Reduction in the capacity and life of reservoir was studied
  • 13.
  • 14. 1978 - Tehri Bandh Virodhi Sangharsh Samiti (TBVSS) 74-day hunger strike in 1996 by Sunderlal Bahuguna Many Anti-dam rallies and protest
  • 15. Protester with anti-Tehri Dam slogans Work stopped
  • 17. The design of the dam was finalized in the 1960s when scientific understanding of seismic hazards and seismic engineering solutions were far less advanced than today
  • 18. Location : world's most earthquake-prone regions with several fault lines traversing the project area. Not adequately equipped to withstand earthquakes of the magnitude expected during its life span Designed for 7.2 ; expected : 8.5 or more One of the leading seismologists in the world, Professor James Brune, has described Tehri as “one of the most dangerous dams world-wide.”
  • 19.
  • 20. If the dam fails or a major landslide causes a huge wave to overtop the reservoir, a 260-meter high flood wave would crash down into the densely populated valleys below the dam, burying the towns of Rishikesh, Hardwar, Bijnor, Meerut, Hapur and Bulandshahar within hours and devastating large areas of the Gangetic Plains. Estimate : 10 million people
  • 21. December 2001 : main bridge leading to Tehri town and nearby areas submerged. Can lead to complete submergence of Tehri Town and surrounding villages.
  • 22.
  • 23.
  • 24. Tehri Dam then and now
  • 25.
  • 26. Massive transfer of water from the Himalayan region to New Delhi, where the average per capita consumption of water is 250 liters per day as compared to 10 liters per day for the villagers of the Tehri region “The Tehri project is stealing from the poor to subsidize the rich,” says Bahuguna.
  • 27. Around 1 lakh affected directly or indirectly. No resettlement plan : some given compensation , some house , others nothing rehabilitation appalling, even though a sum of Rs 1117.15 lakhs is reported to have been spent
  • 28. A cost-benefit analysis by the Indian National Trust for Art and Culture Heritage (INTACH) came to the conclusion that the costs of the US$2 billion project will be at least twice as high as the expected benefits. Tehri is “an enormous squandering of public money.
  • 29. 1980 : Rs.206 crores 1994 : Estimated price - US$612 million 1999 : Estimated price - US$1.2 billion On Completion of first phase : July 2006 More than US$ 2.5 billion
  • 30. Life of Dam Projected 100 years due to the huge volume of sediment that will be trapped in its reservoir – reduced to 30-40 Cost of electricity per unit almost trice the average cost of power supply in the neighboring states
  • 32. Situated at an elevation between 1550 to 1950 mts. A modern and well planned town Important centre of attraction
  • 35. Just Before the construction
  • 39.
  • 40. Muddy waters from Tehri Dam construction
  • 41.
  • 48.
  • 50. Compensation has been reserved for those who had land in their name before 1985 Only Who had more than half of their lands acquired qualify for complete rehabilitation Government's rehabilitation policy does not clearly state anything about partially submerged villages
  • 51. “This is a dam built with our tears” ………… SunderlalBahuguna